Anticipatory action ahead of a forecast cyclone landfall
Raised 7 Sept 2026
- Reached
- 41.2K
- Disbursed
- £372,000
- Location
- Satkhira, Khulna, Bagerhat, Patuakhali
- Crisis to community reach
- 0 days
Programme
Acting before the crisis arrives. Scientific triggers release funding on forecast rather than on observed impact, so support can reach households while there is still time for it to change the outcome.
Most humanitarian money moves after damage is visible. DRF moves it while the forecast is still a forecast.
The logic is simple and the discipline is hard. A hazard is modelled, a threshold is agreed in advance, a plan is written before anything happens, and money is committed to that plan. When the forecast crosses the threshold, funds release automatically — no appeal, no negotiation, no waiting for images of damage.
The uncomfortable part is that this means sometimes paying out for a hazard that does not fully materialise. That is not waste; it is the cost of acting on probability. The alternative — waiting for certainty — means always arriving after the harm.
For funding released after a crisis, see Start Fund Bangladesh.
Three pillars
DRF only works when all three are in place. Any one of them missing and the money either cannot release or releases into nothing.
A hazard model with an agreed impact threshold — how much rainfall, what wind speed, which minimum temperature — built with FOREWARN Bangladesh and reviewed independently. The model defines what counts as a trigger before anyone has an interest in the answer.
Written in advance with the members who will deliver it: who does what, in which unions, for how many households, with what transfer value. Because the plan already exists, activation is execution rather than design.
Money committed against the plan ahead of the season through Start Ready, so the release is automatic when the threshold is crossed. Pre-arranged finance is what turns a plan into an action.
Contingency layer
A contingency planning mechanism targeting the most vulnerable districts for seasonal preparedness.
Not every risk is forecastable to a threshold, and not every district has a model. The National Reserve covers that gap: a contingency layer that targets the most vulnerable districts for seasonal preparedness — cyclone shelter maintenance, pre-positioning, early warning dissemination — rather than waiting for a trigger.
Some DRF allocation decisions are made collectively through Start Network with representatives from different countries, because the risk being pooled is global. See Our global network of networks.
Image to source
Seasonal preparedness in practice: cyclone shelter maintenance — someone checking or repairing a shelter before the season, with the structure clearly identifiable. Preparedness is chronically under-photographed because nothing dramatic is happening, which is exactly why a specific, well-composed image matters here.
4/3 · consent + credit required
Start Ready · live
Contingency plans are signed and financing is committed for the pre-monsoon cyclone window across the coastal belt. Forecast monitoring is active against the agreed impact thresholds; no trigger has been crossed since Alert B091.
Live system coverage
Where a risk model, a signed contingency plan and committed financing are all in place.
Loading map…
Circle size shows the number of DRF activations recorded in that district.
Anticipatory delivery
Placeholder figures pending Salesforce integration.
Timeliness
For anticipatory alerts the crisis date is the hazard's arrival, so reaching people before it shows as a short — sometimes negative — interval. That is the mechanism working.
Projects
Written sections for now. Once project volume passes roughly twelve with consistent fields, these become a template with their own index.
Impact-based forecast triggers for riverine flooding, with contingency plans held by char-based members. The model and threshold work is under independent review.
Pre-agreed plans covering the coastal districts, combining anticipatory cash with shelter readiness and early warning dissemination in Bangla and local dialect.
Forecast minimum-temperature triggers releasing support to char households ahead of the coldest nights rather than after them.
Seasonal rainfall-deficit triggers timed to the sowing window, which is the only point at which drought support changes an outcome rather than compensating for one.
Recent activations
Raised 7 Sept 2026
Raised 5 Jan 2026
Raised 2 Apr 2025
Learning & resources
What's coming up